Open house to showcase final Hawthorne Crossing design
Full text, courtesy of The Bulletin
The final design for Bend’s planned Hawthorne Crossing pedestrian and bicycle bridge is ready for public review. The Oregon Department of Transportation and City of Bend will host an open house from 4:30 to 7 p.m. on Dec. 3, at Open Space Event Studios (220 NE Lafayette Ave).
The event will feature the final design presentation and an overview of the project’s next steps and timeline. Design details include new bridge landings, street connections and aesthetic features will be covered.
The bridge will extend Hawthorne Avenue across U.S. 97 and the BNSF Railway tracks. It’s designed to create a safer connection between east and west Bend for people walking, biking or using mobility devices.
The estimated $32 million project is funded through a combination of federal, state and city contributions.
A virtual open house is available through Dec. 10 at direc.to/nvj6.
Original story at The Bulletin
Also reported by
- Bend unveils final Hawthorne Crossing bridge designs; open house scheduled Central Oregon Daily, 1 day ago
More News news
- 'What I was wearing is what survived' - sisters lose everything as fire destroys home East Anglian Daily Times, 7 hours ago
- Madras vs Molalla Boys Basketball - Feb 26, 2027 Sports Illustrated, 8 hours ago
- Central Oregon Daily News at 6:00 p.m. (Replay) Central Oregon Daily, 8 hours ago
- Time for winter tires: Les Schwab preps drivers and OAS shuttles for snow KTVZ, 8 hours ago
- Bend Central Library earns highest global green building honor Central Oregon Daily, 10 hours ago
- Pet Pals: JillyBean the sweet puppy is one of six siblings looking for a forever home! KTVZ, 10 hours ago